Indian Railways train

01154 RN-CSMT GANPATI SPL

विशेष
TypeExtra Rush Special
RailwayCR
Return01153
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

01154 RN-CSMT GANPATI SPL route overview

Departure
RN
RATNAGIRI
04:00
Arrival
CSMT
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS
13:30
9 hr 30 minDuration
349 kmDistance
37 km/hAvg speed
17Stops

01154 RN-CSMT GANPATI SPL runs from RATNAGIRI (RN) to CHHATRAPATI SHIVAJI MAHARAJ TERMINUS (CSMT), covering 349 km in approximately 9 hr 30 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
LHB · 22 coaches · 3 rakes PM: MUMBAI (WADI BANDAR) [WB] (CR)
Travel classes
SL3A
Runs on
MonTueWedThuFriSatSun
Running
Of 18 Sep, has standing at Aravali Road at 05:38 (41 min late).

01154 coach composition

CURRENT
22 Coaches
0
L
1
SLRD
2
GEN
3
GEN
4
GEN
5
S1
6
S2
7
S3
8
S4
9
S5
10
S6
11
S7
12
S8
13
S9
14
S10
15
S11
16
S12
17
B1
18
B2
19
GEN
20
GEN
21
GEN
22
SLRD

01154 route and timetable

17 halts · 42 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
RATNAGIRI (RN)
04:00
-
0 km
2 non-stop stations · 33.3 km at 48 km/hr
SANGAMESHWAR ROAD (SGR)
04:42 - 04:44
-
33.32 km
KADAVAI (KDVI)
04:50 - 04:51
-
40.52 km
ARAVALI ROAD (AVRD)
04:57 - 04:59
Pf*
47.19 km
SAWARDA (SVX)
05:07 - 05:09
Pf*
57.30 km
KAMATHE (KMAH)
05:23 - 05:25
Pf*
65.96 km
CHIPLUN (CHI)
06:03 - 06:05
Pf*
75.73 km
1 non-stop station · 29.6 km at 63 km/hr
KHED (KHED)
06:33 - 06:35
Pf*
105.33 km
3 non-stop stations · 35.5 km at 44 km/hr
KARANJADI (KFD)
07:23 - 07:25
Pf*
140.84 km
1 non-stop station · 15.9 km at 25 km/hr
VEER (VEER)
08:03 - 08:05
Pf*
156.75 km
1 non-stop station · 16.6 km at 36 km/hr
MANGAON (MNI)
08:33 - 08:35
Pf*
173.34 km
2 non-stop stations · 30.3 km at 21 km/hr
ROHA (ROHA)
10:00 - 10:05
Pf*
203.64 km
3 non-stop stations · 41.5 km at 75 km/hr
PEN (PEN)
10:38 - 10:41
Pf*
245.12 km
5 non-stop stations · 35.5 km at 59 km/hr
PANVEL (PNVL)
11:17 - 11:22
Pf*
280.58 km
8 non-stop stations · 35.1 km at 36 km/hr
THANE (TNA)
12:21 - 12:24
Pf*
315.69 km
10 non-stop stations · 24.2 km at 31 km/hr
DADAR (DR)
13:11 - 13:14
Pf*
339.86 km
6 non-stop stations · 8.8 km at 33 km/hr
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS (CSMT)
13:30
Pf*
348.71 km

Review 01154 RN-CSMT GANPATI SPL

Help other passengers with an honest, useful journey review.

5.0
1 traveller review

Ratings are submitted by RailJournal travellers.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

1 total
Traveller · 5.0 20 hr ago

Train FAQs

What is the schedule of RN-CSMT GANPATI SPL (01154)?

RN-CSMT GANPATI SPL (01154) runs from RATNAGIRI to CHHATRAPATI SHIVAJI MAHARAJ TERMINUS. Check the timetable above for every scheduled stop.

What is the route of RN-CSMT GANPATI SPL (01154)?

RN-CSMT GANPATI SPL (01154) connects RATNAGIRI and CHHATRAPATI SHIVAJI MAHARAJ TERMINUS. The complete stop-by-stop route is listed in the timetable above.

On which days does RN-CSMT GANPATI SPL (01154) run?

RN-CSMT GANPATI SPL (01154) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of RN-CSMT GANPATI SPL (01154)?

The composition section above shows 22 coaches for RN-CSMT GANPATI SPL (01154).