Indian Railways train

01153 CSMT-RN GANPATI SPL

विशेष
TypeExtra Rush Special
RailwayCR
Return01154
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

01153 CSMT-RN GANPATI SPL route overview

Departure
CSMT
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS
11:30
Arrival
RN
RATNAGIRI
20:25
8 hr 55 minDuration
349 kmDistance
39 km/hAvg speed
17Stops

01153 CSMT-RN GANPATI SPL runs from CHHATRAPATI SHIVAJI MAHARAJ TERMINUS (CSMT) to RATNAGIRI (RN), covering 349 km in approximately 8 hr 55 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
LHB · 22 coaches · 3 rakes PM: MUMBAI (WADI BANDAR) [WB] (CR)
Travel classes
SL3A
Runs on
MonTueWedThuFriSatSun
Running
Of 17 Sep, has arrived at Ratnagiri at 20:15 (On Time).

01153 coach composition

CURRENT
22 Coaches
0
L
1
SLRD
2
GEN
3
GEN
4
GEN
5
GEN
6
B1
7
B2
8
S1
9
S2
10
S3
11
S4
12
S5
13
S6
14
S7
15
S8
16
S9
17
S10
18
S11
19
S12
20
GEN
21
GEN
22
SRD

01153 route and timetable

17 halts · 42 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS (CSMT)
11:30
Pf*
0 km
6 non-stop stations · 8.9 km at 38 km/hr
DADAR (DR)
11:44 - 11:47
Pf*
08.85 km
10 non-stop stations · 24.2 km at 58 km/hr
THANE (TNA)
12:12 - 12:15
Pf*
33.02 km
8 non-stop stations · 35.1 km at 41 km/hr
PANVEL (PNVL)
13:07 - 13:12
Pf*
68.13 km
5 non-stop stations · 35.5 km at 61 km/hr
PEN (PEN)
13:47 - 13:50
Pf*
103.59 km
3 non-stop stations · 41.5 km at 41 km/hr
ROHA (ROHA)
14:50 - 14:55
Pf*
145.07 km
2 non-stop stations · 30.3 km at 87 km/hr
MANGAON (MNI)
15:16 - 15:18
Pf*
175.37 km
1 non-stop station · 16.6 km at 83 km/hr
VEER (VEER)
15:30 - 15:32
Pf*
191.96 km
1 non-stop station · 15.9 km at 34 km/hr
KARANJADI (KFD)
16:00 - 16:02
Pf*
207.87 km
3 non-stop stations · 35.5 km at 37 km/hr
KHED (KHED)
17:00 - 17:02
Pf*
243.38 km
1 non-stop station · 29.6 km at 49 km/hr
CHIPLUN (CHI)
17:38 - 17:40
Pf*
272.98 km
KAMATHE (KMAH)
17:49 - 17:51
Pf*
282.75 km
SAWARDA (SVX)
18:00 - 18:02
Pf*
291.41 km
ARAVALI ROAD (AVRD)
18:15 - 18:17
Pf*
301.52 km
KADAVAI (KDVI)
18:23 - 18:24
Pf*
308.19 km
SANGAMESHWAR ROAD (SGR)
18:31 - 18:33
Pf*
315.39 km
2 non-stop stations · 33.3 km at 18 km/hr
RATNAGIRI (RN)
20:25
Pf*
348.71 km

Review 01153 CSMT-RN GANPATI SPL

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of CSMT-RN GANPATI SPL (01153)?

CSMT-RN GANPATI SPL (01153) runs from CHHATRAPATI SHIVAJI MAHARAJ TERMINUS to RATNAGIRI. Check the timetable above for every scheduled stop.

What is the route of CSMT-RN GANPATI SPL (01153)?

CSMT-RN GANPATI SPL (01153) connects CHHATRAPATI SHIVAJI MAHARAJ TERMINUS and RATNAGIRI. The complete stop-by-stop route is listed in the timetable above.

On which days does CSMT-RN GANPATI SPL (01153) run?

CSMT-RN GANPATI SPL (01153) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of CSMT-RN GANPATI SPL (01153)?

The composition section above shows 22 coaches for CSMT-RN GANPATI SPL (01153).