Indian Railways train

67767 Dornakal - Vijayawada MEMU

डोर्नकल - विजयवाड़ा मेमू
TypeMainline Electric Multiple Unit
RailwaySCR
Return67768
Representative Indian Railways gallery image photo 1Representative Indian Railways gallery image photo 2Representative Indian Railways gallery image photo 3Representative Indian Railways gallery image photo 4Representative Indian Railways gallery image photo 5Representative Indian Railways gallery image photo 6Representative Indian Railways gallery image photo 7Representative Indian Railways gallery image photo 8 1 / 8
Representative gallery slideshow

67767 Dornakal - Vijayawada MEMU route overview

Departure
DKJ
DORNAKAL JN
09:10
Arrival
BZA
VIJAYAWADA JN
12:10
3 hr 00 minDuration
122 kmDistance
41 km/hAvg speed
16Stops

67767 Dornakal - Vijayawada MEMU runs from DORNAKAL JN (DKJ) to VIJAYAWADA JN (BZA), covering 122 km in approximately 3 hr 00 min. It operates on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

Rake & maintenance
MEMU · 12 coaches · 6 rakes PM: MOULA ALI [MLY] (SCR)
Travel classes
Runs on
MonTueWedThuFriSatSun
Running
Of 17 Sep, has arrived at Vijayawada Jn at 13:02 (52 min late).

67767 coach composition

CURRENT
12 Coaches
0
L
1
GEN
2
GEN
3
GEN
4
GEN
5
GEN
6
GEN
7
GEN
8
GEN
9
GEN
10
GEN
11
GEN
12
GEN

67767 route and timetable

16 halts · 4 non-stop stations

Loading crossings & overtakes...
Station
Timings
PF
Dist
DORNAKAL JN (DKJ)
09:10
Pf4*
0 km
1 non-stop station · 6.5 km at 43 km/hr
PAPATAPALLI (PPY)
09:19 - 09:20
Pf1*
06.50 km
MALLEMADUGU (MLMG)
09:28 - 09:29
Pf1*
11.89 km
KHAMMAM (KMT)
09:35 - 09:36
Pf1*
21.20 km
PANDILLAPALLI (PNDP)
09:47 - 09:48
Pf2*
30.59 km
CHINTA KANI (CKN)
09:58 - 09:59
Pf1*
37.01 km
NAGALWANCHA Halt (NVC)
10:03 - 10:04
Pf*
43.12 km
BONA KALU (BKL)
10:15 - 10:16
Pf1*
49.12 km
MOTIMARI (MTMI)
10:23 - 10:24
Pf3*
59.24 km
MADHIRA (MDR)
10:30 - 10:31
Pf1*
65.58 km
TONDALAGPAVARAM (TNGM)
10:40 - 10:41
Pf2*
74.80 km
ERRUPALEM (YP)
10:47 - 10:48
Pf3*
81.19 km
GANGINENI (GNN)
10:59 - 11:00
Pf1*
91.17 km
CHERUVU MADHWRM (CVV)
11:06 - 11:07
Pf1*
97.66 km
1 non-stop station · 13.3 km at 30 km/hr
RAYANAPADU (RYP)
11:34 - 11:36
Pf2*
110.97 km
2 non-stop stations · 11.2 km at 20 km/hr
VIJAYAWADA JN (BZA)
12:10
Pf10*
122.19 km

Review 67767 Dornakal - Vijayawada MEMU

Help other passengers with an honest, useful journey review.

No written reviews yet

Be the first traveller to share useful details.

Choose your rating

Traveller experiences

Recent feedback from the RailJournal community.

No traveller stories yetShare the first review for this train.

Train FAQs

What is the schedule of Dornakal - Vijayawada MEMU (67767)?

Dornakal - Vijayawada MEMU (67767) runs from DORNAKAL JN to VIJAYAWADA JN. Check the timetable above for every scheduled stop.

What is the route of Dornakal - Vijayawada MEMU (67767)?

Dornakal - Vijayawada MEMU (67767) connects DORNAKAL JN and VIJAYAWADA JN. The complete stop-by-stop route is listed in the timetable above.

On which days does Dornakal - Vijayawada MEMU (67767) run?

Dornakal - Vijayawada MEMU (67767) runs on Mon, Tue, Wed, Thu, Fri, Sat, Sun.

What is the coach composition of Dornakal - Vijayawada MEMU (67767)?

The composition section above shows 12 coaches for Dornakal - Vijayawada MEMU (67767).